Construction Updates

October 9 – Beach clearing.

 

October 9 – Beach clearing.

 

September 22 – Cutting of the roadway from the pond to the beach.

 

September 22 – Cutting of the roadway from the pond to the beach.

 

September 22 – Pineview Drive being put in.

 

September 22 – A view of Sand Harbor Lake after the brush was cleared along the shore.

 

September 22 – Topsoil being installed on future sites.

 

August 8 – Work being done to clear Pineview Drive.

 

August 4 – Stripping of roadway and gravel being installed.

 

August 4 – Gravel installed on roads.

 

August 4 – Top soil being installed on future sites.

 

July 27 – View of Sand Harbor Lake.
July 27 – View of Sand Harbor Lake.

 

July 27 – More road work and site top soil being done.

 

July 27 – View of Swan Lake from sites.

 

July 27 – View of Sand Harbor Lake from one of the sites.

 

July 27 – Sites being top soiled.

 

July 27 – Bay Ridge Rd installed, waiting for asphalt.

 

July 27 – Staked out sites, roads going in.

 

July 27 – Shot from main road going into resort. Sites are staked.

 

July 23 – Road being cut to the beach.

 

May 22 – Land balancing between the road and trees.

 

 